Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit

Product Details
Customization: Available
Installation
Method:
Vertical
Operation
Type:
Automatic
Still deciding? Get samples of US$ 23/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Group Corporation
Secured Trading Service
Gold Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
  • Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
  • Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
  • Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
  • Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
  • Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
Find Similar Products

Basic Info.

Model NO.
V3568985-0100
Medium Material
Chemical Synthetic Fiber
Dust Collecting Method
Half Dry
Type
Filter Cartridge Dust Collector
Installation Nmethod
Vertical
Operation Ntype
Automatic
Media
Gas
Temperature
Low Temperature
Actuator
Pneumatic
Connection Form
Clamp
Material
Stainless Steel
Pressure
High Temperature
Valve Structure
Pilot Piston Structure
Power Supply
DC Solenoid Valve
Usage
Safety, Emptying, Drain, Temperature Control
Standard
JIS
Application
Industrial Usage, Household Usage
Transport Package
According to Customer Requirements
Specification
910mm*340mm*29mm
Trademark
SMCC OR NO MARK
Origin
China
HS Code
8481100090
Production Capacity
20000

Packaging & Delivery

Package Size
10.00cm * 8.00cm * 5.00cm
Package Gross Weight
0.300kg

Product Description

Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit

Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part KitAir Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part KitAir Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part KitAir Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit
PRODUCT DETAILS

1.Product name: FLAKT V3568985-0100 Air Solenoid Valve 3" Dust Collector Diaphragm repair kit
2. Operation
Recommended  on time range: 50-500ms 
Recommended time  between pulses: 1 minute or greater

3. Suitable for
Dust collector applications, in particular for reverse pulse jet filter cleaning and its variations including bag filters, cartridge filters, envelope filters, ceramic filters, and sintered metal fibre filters.

INTRODUCTION
 
The compact pulse valve for the Optipulse fabric filters of different types.
is a result of many years of experiences within the fabric filter technology area.
is quick acting with high efficiency.
has small dimensions, the figure after the name stands fir the diameter of the plunger.      
is primarily designed to be used in combination with circular pressure tank.
is easy to install and make service to.
has a very robust design, designed for normal use at air pressure up to 600kPa (6bar). 
Normal max operating temperature (compact pulse valve) 50°C.

MAIN PARTS


DIMENSION SKETCH AND ASSEMBLY 
 
For increasing the locking of all bolts, use LOCKTITE 577 or similar.


 FUNCTION

Volume A connected to the pressure tank, via the slot between the valve house and the plunger. There is same pressure in the volume A as in the pressure tank.
Due to the larger pressurised surface of the plunger in volume A, the plunger is pressed towards the pulse pipe and seals between the pressure tank and the pulse pipe.
The volume B is via the solenoid valve connected to the pilot air. The area is larger on pilot air side so the pilot membrane is pressed down towards the top of the valve house and seals off the volume A from the ambient.

OPENING


When cleaning is initiated, the solenoid valve closes the connection (a) and opens to ambient (b) which means that volume B is evacuated.
The membrane is pressed upward (c) and the volume A is evacuated through the 2 ports at the outer side of the valve house.
The plunger is rapidly moving upwards by the pressure difference over the plunger.
The compressed air in the pressure tank is released through the pulse pipe as a pulse and further on to a row of filter bags.

CLOSING


The solenoid is closed to ambient and opened to the pilot air.
The pilot membrane is pressed down towards the seat.
The pressure above the plunger will be equalised to the tank pressure via the slot between the plunger and the horse and the plunger moves down to the pulse pipe and ends the cleaning pulse.
The time for a sequence (start opening to closed valve) is depending on process demands, i.e Volumeof pulse air per pulse and emission guarantees.
        
 
INSTALLATION

ASSEMBLY INSTRUCTION
NOTE!

Before the assembly of the OPTIPOW units, an accurate cleaning of the internal of the pressure tank is of great importance. Any particle in the tank could in the future give serious problems regarding the operation of the pulse valves.
The OPTIPOW valve is as standard made for vertical installation. When the valve shall operate horizontally an extra internal spring has to be used. By that the plunger will always be in closed position when pressurising the cleaning system.
The OPTIPOW is normally delivered as one unit in a special package. For detailed instructions regarding erection of separate parts, see OPTIPOW assembly drawing.
Unpack the valves at first when mounting them.
Check that there are no visible damages on the valve.
Check that there are no foreign materials inside of the valve.
Check that the top of the pulse pipe is smooth without any burrs.
Position numbers below refers those mentioned in figure 1.
Put the plunger (pos 4) on the top of the pulse pipe. Lubricate the O-ring on the outer side of the valve house (pos 1) and match the house to the plunger. When installing the pulse valve be careful not to damage the O-ring. Tum the house so that the solenoid is pointing in right direction. Screw the four bolts with fingers as long as possible and make then the last setting with tool cross-wise to avoid damages to the O-ring. Torque according to specifications.

NOTE!
The valve house is sensitive to strikes on the bottom part of the house(see sketch below).
If the house is sutyected to a strike and the plunger is not able to move up and down inside the house, you may use a hammer or a conical tool to restore the shape of the taps of the housing, thus letting the plunger move freely up and down.
                                              
Notes regarding spare part installation
When receiving an OPTIPOW unit as spare part there are some additional points to consider at the installation.
Before dismounting the faulty OPTIPOW from the pressure tank, check the following.
  • Unpack the valves at first when mounting them.
  • Check that there are no visible damages on the valve.
  • Check that there are no foreign materials inside of the valve.
  • Check solenoid label, correct type mounted.
  • ATTENTION!  Make sure the pressure tank has been depressurised down to
          surrounding pressure.
NOTE!
Due to risk of particles, moist and other foreign objects, could enter the tank never leave the pressure tank unattended with an open tank hole. If job cannot be completed, remount the old OPTIPOW unit or in other way cover the hole. Never pressurizes an uncompleted tank.
Dismount the intended OPTIPOW unit.
Inject, through the hole, the condition of the internal of the pressure tank, particles, moist etc.
If necessary, clean the internal of the tank with a vacuum cleaner until satisfied result has been archived.
When mounting the spare part OPTIPOW, follow the assembly instruction given in section 5.1.

PILOT AIR CONNECTION 

The pilot air for the solenoid is taken from the incoming tube to the pressure tank. The pipefpr the pilot air is common for all valves in one tank and is connected upstream the main on- off valve of respective tank.
The pipe should have an on-off valve and a non-return valve which ensures that pressure is kept also if pressure decreases during pulsing.

NOTE: 
If a separate feeding pipe for the pilot air is used the pressure for the pilot air should be approx equal to pressure in tank.

A too high pressure will give a remaining deformation to the membrane, which will reduce the lifetime and have a reducing effect on the function of the pulse cleaning.
 

TESTING OF INSTALLATION 

General
When all pulse valves are mounted, the tank unit should be tested regarding leakage as well as function of the individual pulse valves. Principles for the testing and acceptable results should be according to description below.

Testing procedure for tank unit
1.Properly secure the complete assembly to the floor or a non-movable test fixture and then pressurize the tank unit to 200 kPa (2 bar) . Note that the pilot air should have the same pressure. Eliminate eventual leakage in the connections.
If it is impossible to achieve a pressure in the tank check the following points:
If there is a leakage through evacuation ports "B".
Check that the pilot air is connected and that there are no leakages in the connections.
Replace solenoid valve. Note the position of the mark on the side of the solenoid vs. The slit in the top cover when installing.
If a particular valve is leaking; dismount that and check that the plunge is operating free.
If necessary clean the surfaces.
If it is a common leakage; dismount all valves and check measure "A" , picture 8. If necessary, machine the surface of the pulse pipe. Note that the top of the pulse pipes must after machining be polished to avoid sharp edges and finally the tank has to be cleaned.
2.Turn off air supply.
3.Check pressure decrease in tank as a function of time. Allowed pressure decrease is 50 kPa per minute. Even if there is a higher leakage continue to 4.
4.Check the function of each valve by pulsing from 200 kPa. Repeat this for 3 cycles.
5.Repeat from 3. If the leakage still is high try to find out if there is some valve leaking more than other, dismount that and check plunge sealing surface and secondly measure "A" . If necessary, maching surface to right tolerance.
6.Mount valve and start from 3 again. This is to be repeated until an acceptable result is achieved.
7.The final result of the testing should be documented for each tank unit according to example on appendix A. A copy of the result should be returned back to the orderer but also enclosed with the pressure tank at delivery.
 
WHY CHOOSE US 

1. Reliable Quality Assurance System;
2. Cutting-Edge Computer-Controlled CNC Machines;
3. Bespoke Solutions from Highly Experienced Specialists;
4. Customization and OEM Available for Specific Application;
5. Extensive Inventory of Spare Parts and Accessories;
6. Well-Developed Worldwide Marketing Network;
7. Efficient After-Sale Service System

Founded in 1997, Located in Qingdao, China. Qingdao Star Machine Technology Co., Ltd. Is a high-tech enterprise specialized in researching & development, manufacturing and sales of industrial roller chains and sprockets and other conveyor accessories, alstom optipow plunger pulse diaphragm solenoid valve and accessories.

We have a global sales network and service system. At present, there are more than 150 distributors and business cooperative partners in more than 30 countries, including Vietnam, Korea, Thailand, Bangladesh, Singapore, Philippines, Malaysia, Russia, Kazakhstan, Uzbekistan, Ukraine, Iran, Saudi Arabia, Chile, Brazil, Canada, the United States, Mexico, Poland and other countries. "Honesty, efficiency, coordination, innovation" is our corporate culture. "First class quality, reasonable price and timely service" is is our company's unremitting pursuit.

We are a enterprise groups engaged in researching, production, marketing and technical services. Covering 80, 000 square meters, now we have 816 employees including 167 senior professional technicians and a global network of sales and service system. The 219 sets of advanced automatic production equipment provide guarantees for high product quality. We can design and develop products to meet the exact demands of customers, and OEM customizations are also available with us. Our sound global service network can provide customers with timely after-sales technical services.

Air Cleaning Valve Parts V3568985-0100 Bfec DMF-Y-102SA Submerged Valve Diaphragm Kit Nitrile 4inch Dust Collector Membrane with Spring Pulse Jet Valve Part Kit

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now